      两河口大坝长期满蓄运行性态预测研究

      Research on long-term behavioral prediction of Lianghekou Dam under full reservoir operation

      • 摘要: 为准确预测两河口高心墙堆石坝长期满蓄运行下结构安全性态,基于施工期及首次蓄满监测数据,考虑堆石料瞬时变形-流变-湿化等多重因素影响,在流固耦合计算框架下开展心墙堆石坝变形-孔隙水压力多目标反演分析,确定本构模型参数,并对大坝长期变形和孔压状态进行预测。结果表明:基于反演分析得到的两河口大坝变形及孔压结果与实测结果更为吻合;大坝施工质量较好,心墙压实度较高,心墙和堆石变形相当,变形分布合理;受固结、湿化与蠕变作用的影响,坝顶沉降随运行时间发展会持续增加,但增加速度会逐渐变缓,超孔隙水压力逐年消散。研究成果可为类似工程运行管理提供参考。

         

        Abstract: To accurately predict the structural safety behavior of Lianghekou ultra-high core rockfill dam under full reservoir operation, a multi-objective back analysis of dam deformation and pore water pressure was conducted based on monitoring data. The study considered multiple factors, including instantaneous deformation, rheological effects, and wetting deformation of rockfill materials, within a fluid-solid coupling computational framework to determine constitutive model parameters and predict long-term dam deformation and pore pressure distribution. The results showed that the deformation and pore pressure values obtained from the back analysis aligned well with field measurements. The dam exhibited high construction quality, with good compaction of the core wall. The deformations of the core wall and rockfill zones were well-coordinated, and the overall deformation distribution was reasonable. Due to consolidation, wetting, and creep effects, the settlement at the dam crest continued to increase over time, but the rate of increase gradually slowed down. Meanwhile, the excess pore water pressure dissipated year by year. The findings can provide a reference for the structural design and long-term safety control of similar ultra-high rockfill dams.

         

      /

      返回文章
      返回